Xylem MOH2 Multi zone mixing module (obsolete) Manual de usuario Pagina 15

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 22
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 14
15
Installation and operation manual MOH2
www.lainginc.com
Pressure test
Pressurize the pressure hose
Now all heating loops including the compression fittings are being
pressure tested.
Start-up
Preconditions:
•The system boiler loop must be filled properly.
The floor heating system must be filled properly
A suitable control for the MOH2 module must be in place. Caution:
operation without a suitable control can result in overheating of the floor
heating system.
The bypass valve must be set in accordance with the control method
selected and the system parameters.
The presetting knob must be set correctly for the system.
The heating loops must be open.
The connection to the boiler loop [ball valves 10 and 11] must be open.
Start-up
If the preconditions are met, the system can be started up.
First switch on the control.
The first heating up of a floor heating system can take a long time since
the floor can absorb a lot of heat. Additionally, in new construction, the
high humidity in the slab can delay the heat up process.
Vista de pagina 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 21 22

Comentarios a estos manuales

Sin comentarios