Commissioning MultiLab 4010-2
12 ba76142e01 05/2013
3 Commissioning
3.1 Scope of delivery
MeterMultiLab 4010-2
USB cable (A plug on mini B plug)
Power pack
Stand with stand base
Short instructions
Detailed operating manual
CD-ROM
3.2 Power supply
The MultiLab 4010-2 is supplied with power in the following ways:
Mains operation with the supplied power pack
Operation of the system clock with a buffer battery if there is no mains power
supply (see section 12.1.2 E
XCHANGING THE BATTERY, page 86).
3.3 Initial commissioning
Perform the following activities:
Connect the power pack
(see section 3.3.1 C
ONNECTING THE POWER PACK, page 13)
Switch on the meter
(see section 4.2 S
WITCHING ON THE METER, page 19)
Set the date and time
(see section 4.5.5 E
XAMPLE 2 ON NAVIGATION: SETTING THE DATE AND TIME,
page 25)
Mount the stand
(see operating manual of the stand)